检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许晓明 刘宇心 闫萍 王发珍 张晖 XU Xiao-ming;LIU Yu-xin;YAN Ping;WANG Fa-zhen;ZHANG Hui(Technology Center,Beijing Enterprises Water Group Limited,Beijing 100102,China;Shanghai Municipal Engineering Design Institute
机构地区:[1]北控水务集团有限公司技术中心,北京100102 [2]上海市政工程设计研究总院<集团>有限公司,上海200092
出 处:《中国给水排水》2020年第18期60-65,共6页China Water & Wastewater
摘 要:浙江某污水厂提标及扩建工程总规模为4×10^4m^3/d,其中提标2×10^4m^3/d、扩建2×10^4m^3/d。污水厂原采用厌氧水解+MSBR+絮凝沉淀池+V型滤池处理工艺,出水执行一级A排放标准,提标及扩建工程要求出水水质达到浙江省地方标准《城镇污水处理厂主要水污染物排放标准》(DB 33/2169—2018)中现有污水厂标准。针对进水中工业废水占比为60%、污染物浓度波动大、含难降解有机物等特点,扩建工程采用调节池+水解酸化池+二级A/O生化池+芬顿+高效沉淀池+V型滤池工艺。提标工程将原MSBR池改造为A/A/O池,并增加了芬顿深度处理工艺,改造了絮凝沉淀池,实际运行效果良好,出水水质完全达到设计目标,直接运行成本为1.42元/m^3。The total scale of upgrading and expansion project in a wastewater plant in Zhejiang is4 × 10^4 m^3/d,including upgrading project of 2 × 10^4 m^3/d and expansion project of 2 × 10^4 m^/d. The wastewater treatment plant originally adopted anaerobic hydrolysis + MSBR + flocculation sedimentation tank + V-type filter treatment process,the effluent carries out the first class A discharge standard. The upgrading and expansion project requires the effluent quality to meet the existing wastewater treatment plant standard in Zhejiang Province local standard Discharge Standard of Major Water Pollutants for Municipal Wastewater Treatment Plant( DB 33/2169-2018). According to the characteristics of 60%industrial wastewater in influent,large fluctuation of pollutant concentration and refractory organic matter,the process of regulating tank + hydrolysis acidification tank + two-stage A/O + Fenton + high efficiency sedimentation tank + V-type filter was adopted in the expansion project. The Fenton process was added,and MSBR was transformed into A/A/O tank,flocculation sedimentation tank was reformed in upgrading project. The actual operation effect was good, and the effluent quality reached the design goal completely,and the direct operating cost was 1. 42 yuan/m^3.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117