某核电站设备冷水热交换器反冲洗性能研究  

Research on Backwash Performance of Component Cooling Water Heat Exchanger in a Nuclear Power Plant

在线阅读下载全文

作  者:张一帆 ZHANG Yi-fan(l.Shanghai University of Electric Power;Sanmen Nuclear Power Co.,Ltd.)

机构地区:[1]上海电力大学能源与机械工程学院,上海200090 [2]三门核电有限公司

出  处:《电站系统工程》2020年第6期74-76,共3页Power System Engineering

摘  要:国内核电站设备冷却水热交换器运行一段时间后换热性能下降,导致高温季节时设备冷却水系统(CCS)供水温度濒临报警值,热交换器海水侧定期反冲洗后换热性能改善。通过对比反冲洗前后热交换器性能,分析热交换器反冲洗策略后,提出增加高温季节热交换器海水侧反冲洗频次、热交换器海水侧增加压差仪表等建议。The component cooling water heat exchange of domestic nuclear power plant performance decreases after a period of operation, resulting in the temperature of supplying water of Component Cooling Water System(CCS)approaching the alarm value in the high temperature season, and the heat exchange performance improves after seawater side regular backwashing. It compares the performance of the heat exchanger before and after backwashing, and analyzes the heat exchanger backwashing strategy, and then puts forward suggestions such as increasing the frequency of backwashing on the seawater side of the heat exchanger in high-temperature seasons, and Installing a differential pressure meter on the seawater side of the heat exchanger.

关 键 词:核电站 热交换器 反冲洗 

分 类 号:TL3[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象