火电厂RUNBACK过程分析及可靠性建议  

Runpack Process Analysis and Reliability Suggestion of Thermal Power Plant

在线阅读下载全文

作  者:李军亮 Li Jun-liang

机构地区:[1]阳城国际发电有限责任公司,山西晋城048102

出  处:《今日自动化》2020年第5期4-6,共3页Automation Today

摘  要:RB试验是协调控制系统乃至整个热控系统在调试及投运过程中一个综合性的重要实验项目。CCS以及热控装置、热控系统的优化、调整是建立在机组燃烧等运行工况通过不断优化、调整最终稳定运行的基础上,而RB试验则是建立在CCS及其他热控系统所有调试项目全部完成、投运正常的基础上进行。CCS的RB实验对机组的整体性能及自动化水平的提高有重大的意义。完善及可靠性的RB功能设计能够保证机组在主要辅机故障跳闸后安全稳定运行。RB test is a comprehensive and important experimental project in the process of debugging and putting into operation of the coordinated control system and even the whole thermal control system.The optimization and adjustment of CCS,thermal control device and thermal control system is based on the continuous optimization and adjustment of unit combustion and other operating conditions,while RB test is based on the completion of all commissioning items of CCS and other thermal control systems and normal operation.RB experiment of CCS is of great significance to improve the overall performance and automation level of the unit.The perfect and reliable RB function design can ensure the safe and stable operation of the unit after the main auxiliary equipment fails to trip.

关 键 词:火电厂RB(RUNBACK) 过程分析可靠性 CCS 

分 类 号:TK323[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象