检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江海涛 肖峰 马卫华 张尔乐 潘宏承 彭旺 刘振 JIANG Hai-tao;XIAO Feng;MA Wei-hua;ZHANG Er-le;PAN Hong-cheng;PENG Wang;LIU Zhen(State Grid AC Engineering Construction Company,Beijing 100032,China)
机构地区:[1]国家电网有限公司交流建设分公司,北京100032
出 处:《电工电气》2020年第11期62-65,共4页Electrotechnics Electric
摘 要:1000 kV可控并联电抗器首次在特高压工程进行应用,缺少针对性的设备安装质量工艺控制措施和验收标准。基于先行国家、行业和企业规范标准,对1000 kV可控并联电抗器的设备组成与特点进行了阐述,重点介绍了电抗器本体和晶闸阀体的安装工艺与要点,并从现场施工及设备功能性的角度,研究了其施工质量验收标准,为当下和未来特高压同类施工提供必要的依据和参考。The 1000 kV controllable shunt reactor was applied for the first time in UHV engineering,the targeted equipment installation quality process control measures and acceptance standards are absent.Based on the national,industry and enterprise standards,the equipment composition and characteristics of 1000 kV controllable shunt reactor are described.The installation process and main points of the reactor body and thyristor valve body are mainly introduced,and from the site operation and equipment functionality,the construction quality acceptance standard was studied,which provides the necessary basis and reference for the current and future UHV similar construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38