作 者:刘昌国 董红涛 刘坤亮 LIU Changguo;DONG Hongtao;LIU Kunliang(Shaanxi Binchang Xiaozhuang Mining Co.,Ltd.,Xianyang Shaanxi 713500)
出 处:《智能建筑与工程机械》2020年第6期111-112,共2页Intelligent Building and Construction Machinery
摘 要:立井提升系统首绳更换是立井提升系统管理中一项工作量大、工作条件艰难、工作风险大的关键施工工作。传统的首绳更换作业通常需要3~5 d,而采用交互式快速换绳则只需要8~10 h便可完成,本文结合我矿更换主井提升2#系统更换首绳和悬挂装置施工作业,介绍了交互式快速换绳的应用及工作要点,以期进一步提高小庄煤矿主井换绳效率。The first rope replacement of shaft hoisting system is a key construction work with heavy workload,difficult working conditions and high risk in the management of shaft hoisting system.The traditional first rope replacement operation usually takes 3~5 days,while the interactive fast rope replacement only takes 8~10 hours.This paper introduces the application and key points of interactive fast rope replacement based on the replacement of head rope and suspension device of hoisting 2 system in main shaft of Xiaozhuang coal mine,so as to further improve the efficiency of rope replacement in Xiaozhuang coal mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.131.95.159