特大型矿井提升机结构和布置方式的选择  被引量:2

Selection of structure and layout mode of super-large mine hoist

在线阅读下载全文

作  者:赵书忠 ZHAO Shuzhong(Chinacoal Tianjin Design Engineering Co.,Ltd.,Tianjin 300120,China)

机构地区:[1]中煤天津设计工程有限责任公司,天津300120

出  处:《矿山机械》2020年第10期33-36,共4页Mining & Processing Equipment

摘  要:结合葫芦素矿井主井提升系统的设计,介绍了内装式提升机和直联悬挂式提升机的结构特点,比较了塔式提升机和落地式提升机的布置方式,对大型立井提升系统提升机结构和布置方式提出了自己的观点,条件允许时内装式提升机是合理的选择,工期允许时应优先选择塔式布置方式。Based on the design of the hoisting system in the main shaft of Hulusu Mine,the paper introduced the built-in hoist and the direct-connected suspension hoist about their structural characteristics,and compared the tower hoist and the floor hoist in layout mode.It also offered its own point of view about the structure and layout mode of the hoist of the hoisting system in large shaft,which was the built-in hoist was the reasonable selection if the condition was allowable and the tower hoist should be selected in priority if the construction period was allowable.

关 键 词:提升系统 布置方式 内装式提升机 直联悬挂式提升机 

分 类 号:TD534[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象