作 者:刘江 Liu Jiang(Yangtze River Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010)
机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010
出 处:《中阿科技论坛(中英文)》2020年第10期21-24,共4页China-Arab States Science and Technology Forum
摘 要:缅甸孟东水电站装机容量达7000 MW,送电中国、泰国和缅甸,文章分析了电站运行特点及在电力系统中的作用,对电器主接线方案进行技术、经济论证,提出左岸电厂和右一电厂发电机与变压器的组合方式采用联合单元接线;右二电厂发电机与变压器的组合方式采用单元接线。The Mengdong Hydropower Station in Burma has an installed capacity of 7,000 MW and will send electricity to China,Thailand and Burma.This paper analyzes the operation characteristics of the power station and its role in the power system,and makes technical and economic demonstration for the main wiring scheme of the electrical appliances.The combined mode of generator and transformer in left bank power plant and right first power plant is proposed by using joint unit connection.The combination mode of generator and transformer in the second right power plant adopts unit connection.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.203.21