作 者:徐琛 刘晓丽[1] 张鲁军 毛宗原 周建军 王思敬[1,6] XU Chen;LIU Xiaoli;ZHANG Lujun;MAO Zongyuan;ZHOU Jianjun;WANG Sijing(State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China;Qilu Transportation Materials Technology Development Co.,Ltd.,Jinan 250014,Shandong,China;China Academy of Building Research,Beijing 100013,China;State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450001,Henan,China;China Railway Tunnel Group Co.,Ltd.,Guangzhou 511458,Guangdong,China;Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China)
机构地区:[1]清华大学水沙科学与水利水电工程国家重点实验室,北京100084 [2]齐鲁交通材料技术开发有限公司,山东济南250014 [3]中国建筑技术集团有限公司,北京100013 [4]盾构及掘进技术国家重点实验室,河南郑州450001 [5]中铁隧道局集团有限公司,广东广州511458 [6]中国科学院地质与地球物理研究所,北京100029
出 处:《隧道与地下工程灾害防治》2020年第2期41-46,共6页Hazard Control in Tunnelling and Underground Engineering
基 金:国家重点研发资助项目(2018YFC1504902);水沙科学与水利水电工程国家重点实验室资助项目(2019-KY-03)。
摘 要:基于隧道掘进机(tunnel boring machine,TBM)施工过程和施工工艺,融合三维地质建模技术和工程仿真技术,建立长隧道三维地质模型和施工循环网络仿真模型,实现长隧道TBM施工过程的可视化与施工进度的仿真预测。以西藏DXL隧道工程为研究对象,耦合DXL隧道三维地质模型,通过仿真计算对DXL隧道TBM施工段进度计划进行优化分析,统计拟合完工概率随施工工期变化的函数曲线,计算出预期完工概率,实现了施工过程的可视化,并提出保障施工进度的措施和建议。Based on the analysis of the tunnel TBM construction process and technology,using the three-dimensional geological modeling technology and engineering simulation technology,a construction cycle network simulation model was established,which could achieve the prediction and visual analysis of TBM tunnel construction process.Taking the DXL tunnel project in Tibet as the research object,coupled with the three-dimensional geological model of the DXL tunnel,an optimized analysis of the TBM construction schedule of the DXL tunnel was performed through simulation calculations.The relationship between the completion probability and the construction time was fitted,and the expected completion probability was determined.The construction process was visualized and suggestions to guarantee the construction progress were proposed.
关 键 词:TBM施工 三维地质模型 循环网络模型 施工进度仿真 完工概率
分 类 号:TV512[水利工程—水利水电工程] TP391[自动化与计算机技术—计算机应用技术]