苗尾水电站水轮发电机定子下线工艺  

Stator Winding Technology of Hydro Generator in Miaowei Hydropower Station

在线阅读下载全文

作  者:原嘎嘎 付有泰 Yuan Ga-ga;Fu You-tai

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《电力系统装备》2020年第21期68-70,共3页Electric Power System Equipment

摘  要:水电站水轮发电机定子在现场进行整体下线时,下线质量的好坏关系到将来机组的安全稳定运行,苗尾水电站水轮发电机定子下线过程中采用了新技术、新工艺,在较短工期内,通过强化工序管控,改进工艺,提高了下线质量与施工效率。本文介绍了苗尾水电站水轮发电机定子下线工艺,为同类型电站提供技术支持和参考。When the hydro generator stator of hydropower station is installed on site,the quality of the winding is related to the safe and stable operation of the unit in the future.New technology and new technology are adopted in the stator winding process of the hydro generator of Miaowei hydropower station.In the short construction period,through strengthening the process control and improving the process,the offl ine quality and construction effi ciency are improved.This paper introduces the Miaowei hydropower station The stator winding technology of hydro generator in power station can provide technical support and reference for the same type of power station.

关 键 词:水电站 定子下线 工艺 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象