竖向顶管法中的水平盾构隧道管片设计方法研究  被引量:4

Study on Segment Lining Design Method of Horizontal Shield Tunnels in the Vertical Pipe Jacking Method

在线阅读下载全文

作  者:闫自海 周烽淼 甘鹏路 魏新江 魏纲 王霄[4] 章书远 YAN Zihai;ZHOU Fengmiao;GAN Penglu;WEI Xinjiang;WEI Gang;WANG Xiao;ZHANG Shuyuan(Power China Huadong Engineering Corporation,Hangzhou 311122;Engineering Research Center of Smart Rail Transportation of Zhejiang Drovince,Hangzhou 311225;Department of Civil Engineering,Zhejiang University City College,Hangzhou 310015;College of Civil Engineering and Architecture,Zhejiang University,Hangzhou 310058)

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,杭州311122 [2]浙江省智慧轨道交通工程技术研究中心,杭州311225 [3]浙大城市学院土木工程系,杭州310015 [4]浙江大学建筑工程学院,杭州310058

出  处:《现代隧道技术》2020年第S01期726-735,共10页Modern Tunnelling Technology

基  金:华东勘测设计研究院科技项目(KY2016-02-29).

摘  要:竖向顶管法施工具有对周边环境影响小、施工便利等优点,与普通的水平盾构隧道管片的内力计算不同,在竖向顶管法施工过程中,竖向管节的重力、顶管机朝下的顶升反力、竖向开挖引起的土体卸载等因素会引起水平盾构隧道管片的内力变化,因此,有必要对水平盾构隧道管片的内力计算进行研究。将竖向顶管法中的水平盾构隧道分为开口区、反力区、邻接区、主线隧道区四个区域,基于自由变形法,对施工阶段和运营阶段的管片进行了受力分析,根据不同区域及阶段下管片的受力情况,得到各组荷载作用下的内力计算公式,通过算例进行内力计算分析。结果表明:管片环顶部和底部的弯矩在侧向水平地层压力处的差别最大,其它荷载对引起的顶底部弯矩值差异相对较小;除侧向水平压力外,其它各荷载引起的剪力值在管片环顶部和底部基本呈现出互为相反数的关系。The vertical pipe jacking method has the advantages of little impact on the surrounding environment and convenience in construction.Different from the calculation of the internal force of ordinary horizontal shield tunnel segments,factors including the gravity of the vertical pipe sections,the downward reaction force of the pipe jacking machine,and the soil unloading caused by the vertical excavation will lead to the change of segment lining internal force in the horizontal shield tunnel.Therefore,it is necessary to study the internal force calculation of the horizontal shield tunnel segment.The horizontal shield tunnel in the vertical pipe jacking method is divided into four areas:open area,reaction area,adjacent area,and mainline tunnel area.Based on the free deformation method,the stress analysis of the segments in the construction and operation stages is carried out.Moreover,the internal force calculation formulas under different loads are obtained according to the stress conditions of the segments in different areas and stages.An example is introduced to conduct internal force calculation and analysis.The results show that:the difference between the bending moment of the top and bottom of the segment ring is the largest under the lateral horizontal soil pressure,while that under other loads is relatively small.Except for the lateral horizontal pressure,the shear forces caused by other loads are opposite to each other at the top and bottom of the segment ring.

关 键 词:竖向顶管 水平盾构隧道 管片设计 内力计算 

分 类 号:U452[建筑科学—桥梁与隧道工程]

 