检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐吉龙 QI Jilong(Yankuang Xinlu Construction and Development Company Limited,Zoucheng 273500,China)
机构地区:[1]兖矿新陆建设发展有限公司,山东邹城273500
出 处:《建井技术》2020年第5期15-19,共5页Mine Construction Technology
摘 要:万福煤矿主、副、风3个立井是目前世界上穿过冲积层最深的冻结井筒,冻结设计与施工难度大。3个井筒施工中,无一冻结管断裂,实现了井筒冻结段安全、快速、优质施工。对3个井筒冻结设计与施工技术做了梳理总结,为类似矿井冻结设计与施工提供了经验。The mine main shaft,auxiliary shaft and ventilation shaft in Wanfu Mine are the freezing shafts passed through the deepest alluvium in the present world.The freezing design and construction of the three shafts was very difficult.In the constructions of the three shafts,there was non freezing pipe broken occurred and the freezing sections of the mine shafts were safely,rapidly and high quality constructed.The freezing design and construction technology of the three mine shafts were prepared and summarized and could provide the experiences to the ground freezing design and construction of the similar mine shafts.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.52.105