万福煤矿主、副、风井冻结施工技术  被引量:2

Ground Freezing Construction Technology of Mine Main,Auxiliary and Ventilation Shafts in Wanfu Mine

在线阅读下载全文

作  者:齐吉龙 QI Jilong(Yankuang Xinlu Construction and Development Company Limited,Zoucheng 273500,China)

机构地区:[1]兖矿新陆建设发展有限公司,山东邹城273500

出  处:《建井技术》2020年第5期15-19,共5页Mine Construction Technology

摘  要:万福煤矿主、副、风3个立井是目前世界上穿过冲积层最深的冻结井筒,冻结设计与施工难度大。3个井筒施工中,无一冻结管断裂,实现了井筒冻结段安全、快速、优质施工。对3个井筒冻结设计与施工技术做了梳理总结,为类似矿井冻结设计与施工提供了经验。The mine main shaft,auxiliary shaft and ventilation shaft in Wanfu Mine are the freezing shafts passed through the deepest alluvium in the present world.The freezing design and construction of the three shafts was very difficult.In the constructions of the three shafts,there was non freezing pipe broken occurred and the freezing sections of the mine shafts were safely,rapidly and high quality constructed.The freezing design and construction technology of the three mine shafts were prepared and summarized and could provide the experiences to the ground freezing design and construction of the similar mine shafts.

关 键 词:深厚冲积层 立井冻结 分期冻结 自动焊 

分 类 号:TD265.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象