检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊杰[1] XIONG Jie(Sinohydro Bureau 7 Co.,Ltd,Chengdu 610213,China)
机构地区:[1]中国水利水电第七工程局有限公司,成都610213
出 处:《中小企业管理与科技》2020年第33期177-178,共2页Management & Technology of SME
摘 要:城市化高速发展建设背景下其高架桥建设数量逐渐增加,施工中针对现浇箱梁的施工工艺提出了诸多新要求,希望它在确保质量安全的大前提下,也必须重视工艺设计到位。论文主要以武汉市交通21号线一期工程土建部分为例,简单分析了该工程中高架桥现浇箱梁的各项施工工艺要点。Under the background of rapid development and construction of urbanization, the number of viaduct construction is increasing gradually. Many new requirements have been put forward for the construction technology of cast-in-place box beam in construction. It is hoped that under the premise of ensuring quality and safety, it must also pay attention to process design in place. This paper mainly takes the civil construction part of Wuhan Traffic Line 21 phase Ⅰ project as an example and simply analyzes the key points of construction technology of cast-in-place box beam of viaduct in this project.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.115