检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏瑞峰 SU Rui-feng(Construction Project Management Center of No.4 Oil Production Plant of Daqing Oilfield.Daqing 163000,China)
机构地区:[1]大庆油田第四采油厂基建工程管理中心,黑龙江大庆163000
出 处:《全面腐蚀控制》2020年第11期74-76,共3页Total Corrosion Control
摘 要:地面管线是油田生产工艺重要的组成部分之一,油田地面管线铺设距离长、地域跨度大,部分地面管线铺设工程还存在跨季节施工现象,导致地面管线铺设工程工作量大,施工风险较高。课题研究由此出发,深入分析探讨管线铺设过程中存在技术难点及问题,并提出完善对策,旨在为我国油田管道铺设施工技术的研究提供借鉴。the surface pipeline is one of the important parts of oilfield production process.The laying distance of oil field surface pipeline is long and the regional span is large.Some surface pipeline laying projects still have cross season construction phenomenon,which leads to heavy workload and high construction risk of surface pipeline laying engineering.Based on this,this paper analyzes and discusses the technical difficulties and problems existing in the pipeline laying process,and puts forward the improvement countermeasures,aiming to provide reference for the research of pipeline laying construction technology in China's oil fields.
分 类 号:TE983[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28