检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李湘峰[1] 郭万侦[1] 刘玉颖 LI Xiangfeng;GUO Wanzhen;LIU Yuyin(China Renewable Energy Engineering Institute,Beijing 100120,China)
出 处:《水力发电》2020年第12期1-3,共3页Water Power
摘 要:移民安置方式的选择是水电工程建设征地移民安置关键工作之一。其不仅关系到移民安置效果,而且关系到水电工程的建设进度。为响应我国在新时期创新、协调、共享等发展理念的提出以及国家法规政策要求,研究分析了我国水电工程未来征地及安置方式发展趋势,并从建立移民安置方式体系,做好移民安置方式选择规划,完善移民安置方式具体政策等方面提出了对策建议及工作展望。The selection and determination of resettlement methods is one of the key tasks of land acquisition and resettlement for the construction of hydropower projects,which is not only related to the effect of resettlement,but also to the construction progress of hydropower projects.In response to the development ideas of innovation,coordination and sharing in the new era,and the requirements of national regulations and policies,the future trends of land acquisition and resettlement methods for China’s hydropower project development are analyzed.In terms of the establishment of resettlement method system,the selection and planning of resettlement methods,and the improvement of specific policies for resettlement methods,some countermeasures,suggestions and work prospects are put forward.
分 类 号:D632.4[政治法律—政治学] TV752[政治法律—中外政治制度]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118