检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨磊[1] YANG Lei(Beijing Huayu Engineering Co.,Ltd.,Pingdingshan,Henan,467000,China)
机构地区:[1]中煤科工集团北京华宇工程有限公司,河南平顶山467000
出 处:《建筑工程与管理》2020年第7期64-66,共3页Architecture Engineering and Management
摘 要:在煤泥水处理现场中,为了避免煤泥量过多的进入重介旋流器,通常会采取选前湿法脱泥工艺,而煤泥量的含量多少对重介旋流器分选效果影响显著,因此,需要对传统的选前湿法脱泥工艺进行创新和改革,从而提高煤泥水处理的效果和水平。基于此,文章将分析煤泥水处理的意义及其发展现状,并提出具有针对性的优化后的煤泥水处理工艺,以供参考。In the slime water treatment site,in order to avoid excessive amount of slime from entering the dense medium cyclone,the pre-selection wet desliming process is usually adopted,and the content of the slime is relative to the separation of the dense medium cyclone.Therefore,it is necessary to innovate and reform the traditional pre-selection wet desliming process to improve the effect and level of slime water treatment.Based on this,the article will analyze the significance of slime water treatment and its development status,and propose a targeted optimized slime water treatment process for reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15