检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于姿 刘燕军 王京彬 佘雪峰 唐惠庆 YU Zi;LIU Yanjun;WANG Jingbin;SHE Xuefeng;TANG Huiqing(State Key Laboratory of Advanced Metallurgy,University of Science and Technology Beijing,Beijing 100083,China;Iron-making Plant,Delong Iron and Steel Co.,Ltd.,Xingtai 054009,Hebei,China;Technology Innovation Center for Hot Rolled Strip of Hebei,Xingtai 054009,Hebei,China)
机构地区:[1]北京科技大学钢铁冶金新技术国家重点实验室,北京100083 [2]德龙钢铁有限公司炼铁厂,河北邢台054009 [3]河北省热轧板带钢技术创新中心,河北邢台054009
出 处:《江西冶金》2020年第5期13-19,共7页Jiangxi Metallurgy
基 金:国家自然科学基金资助项目(U1960205)。
摘 要:我国废钢产量大且高炉炉料以重污染的烧结矿为主,为了提高废钢利用率和减少炉料中烧结矿比例,文中利用多流体数学模型对高炉加装废钢工艺进行研究。针对820 m3的高炉(高炉铁水产量2950 t/d),考察了矿批中不加废钢(正常炉况)、额外加3.2 t(约12%)的废钢、加装3.2 t废钢并减少不同量(0.8、1.6、2.4、3.2、4.0 t)烧结矿7种工况下的高炉冶炼行为,并对高炉铁水产量、炉顶煤气温度、煤气利用率等高炉技术经济指标进行分析。研究结果表明,矿批中额外加入废钢,会影响高炉顺行。在添加废钢的同时减少矿批中烧结矿的含量,会使高炉炉况趋近正常水平。高炉加装废钢最优化的工艺参数为矿批中废钢的添加量为3.2 t且烧结矿减少量为2.4 t,在此条件下,高炉炉顶煤气温度为445 K,煤气利用率为48.5%,高炉产量提高360 t/d,冶炼每吨生铁节约的焦炭为18.8 kg。The output of scrap steel is large,and the sinter which is produced with heavy pollution is the main blast furnace burden in china.For improving the effective utilization rate of scrap steel and reducing the sinter proportion,a multi-fluid mathematical model was established to study the process of adding scrap steel to blast furnace in this paper.The smelting behavior of 820 m3 blast furnace(hot metal output of blast furnace was 2950 t/d)was investigated under seven working conditions:without scrap per ton of molten iron(normal furnace condition),with an additional 3.2 t(about 12%)of scrap,with addition of 3.2 tons of scrap and reduction of different quantities(0.8,1.6,2.4,3.2,4.0 tons)of sinter in the ore batch.The technical and economic indexes,such as the output of molten iron,the temperature of furnace top gas,and the utilization rate of gas were analyzed in the model.The simulated results showed that,the addition of scrap in the ore batch affected the smooth operation of blast furnace.When adding fixed scrap steel and reducing different amount of sinter led the blast furnace to the normal level.When added 3.2 tons of scrap in the ore batch and the reduced amount of sinter reached 2.4 tons,the process of adding scrap steel to blast furnace was the most reasonable.Under this condition,the top gas temperature of blast furnace was 445 K,the utilization rate of gas was 48.5%,the output of blast furnace was increased by 360 t/d,and the coke saved in smelting per ton of pig iron was 18.8 kg.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36