检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:勾中刚 张义 田德智 GOU Zhonggang;ZHANG Yi;TIAN Dezhi(Sinohydro Bureau 7 Co., Ltd., Chengdu 611130, China;DG Hydropower Branch, Huadian Xizang Energy Co., Ltd., Shannan 856000, China)
机构地区:[1]中国水利水电第七工程局有限公司,四川成都611130 [2]华电西藏能源有限公司大古水电分公司,西藏山南856000
出 处:《水电与新能源》2020年第11期59-63,共5页Hydropower and New Energy
摘 要:为提升西藏DG水电站高寒、高海拔地区厂房结构混凝土在冬季极寒天气下的抗冻、抗裂能力,首先通过对比实验优化越冬保温材料,然后策划了一套针对该厂房混凝土越冬保温的最优适用性方案。经方案的有效落实,最终实现了高寒、高海拔地区厂房混凝土优质越冬,显著提升了混凝土抗裂、抗冻效果。DG Hydropower Station is located in high altitude and cold area.To improve the freezing and cracking resistance of the powerhouse structure concrete in the extremely cold weather in winter,the thermal insulation materials are optimized through comparative experiments,and then an optimal thermal insulation scheme is proposed and implemented.Practice shows that the cracking and freezing resistance of the concrete are significantly improved and the powerhouse concrete passes the winter safely.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7