基于柔直并网的补强措施对近区水电外送影响研究  被引量:2

Research on Impact of Reinforcement Measures Based on VSC-HVDC Grid Connection on Near Area Hydropower Transmission

在线阅读下载全文

作  者:吴芮 胡洋[2] 李甍[2] 贾波 黄牧涛[4] 周良松[1] WU Rui;HU Yang;LI Meng;JIA Bo;HUANG Mutao;ZHOU Liangsong(State Key Laboratory of Advanced Electromagnetic Engineering and Technology(School of Electrical and Electronic Engineering,Huazhong University of Science and Technology),Wuhan Hubei 430074,China;Hubei Qingjiang Hydropower Development Co.,Ltd.,Yichang Hubei 443000,China;Central Southern China Electric Power Design Institute Co.,Ltd.,of China Power Engineering Consulting Group,Wuhan Hubei 430071,China;School of Hydropower&Information Engineering,Huazhong University of Science and Technology,Wuhan Hubei 430074,China)

机构地区:[1]强电磁工程与新技术国家重点实验室(华中科技大学电气与电子工程学院),湖北武汉430074 [2]湖北清江水电开发有限责任公司,湖北宜昌443000 [3]中国电力工程顾问集团中南电力设计院有限公司,湖北武汉430071 [4]华中科技大学水电与数字化工程学院,湖北武汉430074

出  处:《湖北电力》2020年第4期59-64,共6页Hubei Electric Power

基  金:国家重点研发计划(项目编号:2017YFC0405901)。

摘  要:由于柔性直流并网需要对相应电网进行补强,工程涉及范围较广,存在各补强工程不同期投产的情况,导致电网网架结构可能存在较多过渡形态。针对规划中的电网网架结构可能出现的不同过渡形态,以鄂西交流补强工程为例,使用电力系统综合稳定计算程序(PSASP)仿真分析了近区电网的静态、暂态稳定特性,研究了近区水电站外送通道的外送能力和制约因素,并从电网建设时序和系统稳控措施两个方面提出了改进建议,有效降低了电网运行风险,提高了近区水电站外送水平。研究结果对电网规划运行和同类交流补强工程规划设计都具有一定的参考意义。Flexible DC grid connection usually requires reinforcement of the corresponding power grid.Due to the wide scope of the project,there appear cases where various reinforcement projects are put into production in different periods,which results in more transitional forms of the grid structure.Aiming at the different transitional forms that may occur in the planned grid structure of the power grid,and taking the western Hubei AC reinforcement project as an example,this paper uses the power system integrated stability calculation program(PSASP)to simulate and analyze the static and transient stability characteristics of the near-term power grid,and then studies the delivery capacity and restrictive factors of the delivery channel of the hydropower station in the near area.Finally,the paper proposes improvement suggestions from the aspects of power grid construction timing and system stability control measures,which effectively reduces the risk of power grid operation and improves the delivery level of hydropower stations in the near area.The research results are of certain reference significance to power grid planning and operation as well as the planning and design of similar AC reinforcement projects.

关 键 词:柔性直流 补强工程 外送能力 外送约束 稳控措施 

分 类 号:TM74[电气工程—电力系统及自动化]

 