超高层建筑施工升降机停层转换施工技术  被引量:3

Construction Technology of Elevator Stopping and Conversion in Super High-rise Building Construction

在线阅读下载全文

作  者:蒋佳炜 孙祖根 杨晓凤 王沛斌 JIANG Jiawei;SUN Zugen;YANG Xiaofeng;WANG Peibin(Shanghai Construction No.7(Group)Co.,Ltd.,Shanghai 200050,China)

机构地区:[1]上海建工七建集团有限公司,上海200050

出  处:《建筑施工》2020年第11期2099-2101,共3页Building Construction

摘  要:以绿地中心·杭州之门项目为例,介绍了一种超高层建筑施工升降机停层转换施工技术。通过对施工升降机进行停层转换,使核心筒内结构施工具有较为完整的操作面,大大加快了施工进度,同时也降低了施工成本。该技术可以给类似项目提供参考。Taking the Greenland Center Hangzhou gate project as an example,this paper introduces a construction technology of elevator stopping and conversion for super high-rise buildings.Through the stopping and conversion of the construction elevator,the construction of the core tube structure has a relatively complete operation surface,which greatly speeds up the construction progress and reduces the construction cost.This technology can provide reference for similar projects.

关 键 词:超高层建筑 施工升降机 停层转换 垂直运输 

分 类 号:TU61[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象