高挑大断面托顶煤硐室施工技术研究  被引量:1

Study on the Construction Technology of Top Coal Chamber with High Overhanging Section

在线阅读下载全文

作  者:王宝华 蔡鹏 Wang Baohua;Cai Peng(Henan Xinzheng Coal Power Co.,Ltd.,Henan Xinzheng 451184)

机构地区:[1]河南省新郑煤电有限责任公司,河南新郑451184

出  处:《山东煤炭科技》2020年第11期56-58,共3页Shandong Coal Science and Technology

摘  要:新郑煤电公司支架组装间为托顶煤硐室,为解决施工距离短、断面大、开口施工难度较大、顶板管理及围岩变形控制困难等施工技术难题,从工程煤体固化、主被动耦合支护、壁后充填等方面进行了大断面托顶煤硐室施工技术研究。经矿压观测检验,巷道变形量很小,效果良好。The support assembly room of Xinzheng Coal and Power Company is a roof supporting coal chamber.In order to solve the construction technical problems such as short construction distance,large section,difficult opening construction,difficult roof management and surrounding rock deformation control.The construction technology of large section roof coal chamber is studied from the aspects of engineering coal body solidification,active and passive coupling support,back wall filling and so on.By means of observation and inspection of ore pressure,the deformation of roadway is small and the effect is good.

关 键 词:大断面 托煤 硐室 施工 

分 类 号:TD264+.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象