检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许得河 朱信飞 蔺增元 Xu Dehe;Zhu Xinfei;Lin Zengyuan(Yankuang Guizhou Energy Chemical Co.,Ltd.,Guizhou Guiyang 550022;Guizhou Qianxi Energy Development Co.,Ltd.,Guizhou Qianxi 551500;Shandong Anke Mine Support Technology Co.,Ltd.,Shandong Ji'nan 250000)
机构地区:[1]兖矿贵州能化有限公司,贵州贵阳550022 [2]贵州黔西能源开发有限公司,贵州黔西551500 [3]山东安科矿山支护技术有限公司,山东济南250000
出 处:《山东煤炭科技》2020年第11期69-71,74,共4页Shandong Coal Science and Technology
摘 要:针对小屯煤矿沿空巷道小煤柱透水失稳,围岩遇水软化、巷道严重变形等问题,采用数值模拟和现场观测对沿空巷道的受力及变形进行分析,开发了锚注式组合锚杆并提出了"顶板加强护表,两帮加大锚注"的锚杆锚索全锚支护方案。经过现场应用对比,该支护体系下煤柱变形降低了75%,底鼓量平均降低70%,巷道能够保持稳定。Aiming at the problems of small coal pillar seepage instability,surrounding rock softening and roadway serious deformation along gob side roadway in Xiaotun Coal Mine,the stress and deformation of gob side roadway were analyzed by numerical simulation and field observation.The bolt grouting composite bolt was developed,and the bolt cable full anchor support scheme of"strengthening roof protection table and increasing bolt grouting on two sides"was put forward.Through field application comparison,the deformation of coal pillar is reduced by 75%and floor heave is reduced by 70%on average under the support system,and the roadway can keep stable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7