回收煤柱工作面过横川堆煤胶结充填技术研究  

Study on Cemented Filling Technology of Cross Hengchuan Coal Pile in Recovery Coal Pillar Working Face

在线阅读下载全文

作  者:张勇峰 Zhang Yongfeng(Jincheng Coal Industry Group Zhaozhuang Coal Industry,Shanxi Jincheng 048000)

机构地区:[1]晋城煤业集团赵庄煤业开拓二队,山西晋城048000

出  处:《山东煤炭科技》2020年第11期193-195,共3页Shandong Coal Science and Technology

摘  要:针对回收煤柱工作面过横川存在的片帮、冒顶隐患,考虑安全性、煤质、材料消耗3个因素,确定堆煤胶结充填方案,选用无机缓凝注浆材料,满足裂隙扩散流动性和强度需求。结果表明:堆煤胶结充填方式填实程度良好,回采期间发现煤块与浆体胶结良好,未发生片帮、冒顶现象,工作面顺利通过横川。In view of the hidden danger of spalling and roof fall in the working face of recovery coal pillar passing through Hengchuan,considering the three factors of safety,coal quality and material consumption,the cemented filling scheme of coal stacking is determined,and the inorganic retarding grouting material is selected to meet the demand of fracture diffusion fluidity and strength.The results show that the coal-filling cementing filling method has a good degree of filling.During the mining,it was found that the coal block and the slurry were well cemented,and there was no chipping or roofing,and the working face passed through Hengchuan smoothly.

关 键 词:煤柱工作面 堆煤胶结 无机缓凝注浆材料 填实程度 

分 类 号:TD823.7[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象