检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张文娟 ZHANG Wenjuan(Minmetals Mining Holdings Limited)
机构地区:[1]五矿矿业控股有限公司,安徽省合肥市230601
出 处:《现代矿业》2020年第11期17-21,共5页Modern Mining
摘 要:龙塘沿铁矿详查采用100 m×100 m的网度探求控制的资源储量,通过近2 a的生产勘探及开拓、采切、回采工程,发现原有勘查工程间距已不能满足矿山开拓和采准工程的布设要求,导致工程及矿量的浪费。为此,通过与详查阶段的对比验证,采用加密法对龙塘沿Fe25矿体的勘探工程间距进行对比,结合规范确定合理的工程勘查间距,采用50 m×50 m的网度探求控制的资源储量。The detailed investigation of Longtangyan Iron Mine uses a 100 m×100 m net to explore and control the resource reserves.In the past two years,it has been discovered that the original exploration project spacing can no longer meet the requirements of mine development and mining projects through production exploration and development,mining and cutting,and mining projects.The layout requirements result in waste of engineering and mine volume.Through the comparison and verification with the detailed investigation stage,the density method is used to compare the exploration project spacing of the Longtangyan Fe25 ore body,and another reasonable project investigation spacing is determined in combination with the specifications to explore the resource reserves controlled by a network of 50 m×50 m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.133.37