电力隧道盾构区间基岩预处理爆破施工技术研究  被引量:1

Study on Bedrock Pretreating Blast Construction Technology in Shield Section of Electric Power Tunnel

在线阅读下载全文

作  者:罗青松 桑中顺 LUO Qingsong;SANG Zhongshun

机构地区:[1]中国市政工程中南设计研究总院有限公司,湖北武汉430010

出  处:《城市道桥与防洪》2020年第12期154-158,M0016,共6页Urban Roads Bridges & Flood Control

摘  要:以电力隧道盾构施工为研究对象,针对复合地层内开挖断面局部存在高强度基岩、盾构自身刀具无法有效破岩施工的难点,且在施工线路周边存在现状民用建筑的情况下,通过采用预爆破处理方案解决了盾构施工中基岩顶进困难的问题,方案中的爆破剂量、间距、起爆网路和安全防护措施保证了爆破施工的安全,并减少施工过程中的风险。Taking the shield construction of electrical power tunnel as a study object,aiming at the difficulties of high-strength bed rock existing in the local excavated section in the complex stratum and the shield cutter itself hard to efficiently break the rocks,and under the condition of the existing civil buildings around the construction line,the difficult problem of bedrock jacking in the shield construction is solved by the pre-blasting treatment scheme.The blast dosage,interval,initiation network and safety protection measures of the scheme can guarantee the safety of blast construction and reduce the risks in the construction process.

关 键 词:预爆破 盾构 减振 基岩 

分 类 号:U455.6[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象