山西省中部引黄工程隧洞下穿北川河段大口井降水方案可行性分析  

Feasibility Analysis on the Water Drawdown Scheme by Drilling the Large Diameter Well During Constructing the Shanxi Middle Yellow River Diversion Project’s Tunnel Underruning the Beichuan River

在线阅读下载全文

作  者:王松[1] WANG Song

机构地区:[1]山西省水利水电勘测设计研究院有限公司,山西太原030024

出  处:《山西水利科技》2020年第4期10-13,共4页Shanxi Hydrotechnics

摘  要:山西中部引黄工程总干3#隧洞下穿北川河段,开挖过程中由于地下水影响,多次出现突泥、涌水等不良地质情况,并伴随发生两次高速公路路面塌陷。文中通过单孔、多孔、群孔抽水试验等试验方法,论证地表大口井降水的可行性。In the middle of Shanxi,the Yellow River Diversion Project,3#tunnel underruns the Beichuan River.During the excavation process,due to the influence of groundwater,unfavorable geological conditions such as mud burst and water gushing occurred repeatedly,and two highway road collapses were accompanied.By means of single-hole,multi-hole and group-hole pumping tests,the feasibility of water drawdown on large diameter wells is demonstrated.

关 键 词:抽水试验 渗透系数 中心降深 

分 类 号:TV554[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象