检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐康 TANG Kang(Shanghai Highway&BridgeCo.,Ltd.,Shanghai 200082,China)
机构地区:[1]上海公路桥梁(集团)有限公司,上海200082
出 处:《中国市政工程》2020年第6期17-19,110,共4页China Municipal Engineering
摘 要:由于免共振法钢管桩施工工艺具有效率高、影响低、污染小等特点,目前已越来越广泛应用于城市桥梁、公路桥梁、轨道交通以及民航机场等各个领域,其经济效益和社会效益十分显著。由于该工艺的施工原理是利用土体液化进行沉桩,因而桩基承载力增长受限于土体的恢复情况,与常规桩基有别。以免共振法施工的钢管桩试验数据为依托,根据现行其他类似桩基施工及验收规范标准,研究钢管桩承载力的增长恢复规律,可为类似工程钢管桩的检测和验收提供参考和依据。Due to the characteristics of high efficiency,low impact&low pollution,the resonance-free steel pipe pile construction technology has been more&more widely used in urban bridges,highway bridges,rail transit protection&civil aviation airports;and its economic&social benefits are very significant.Because the construction principle of the technology is to use soil liquefaction to drive piles,the increase of bearing capacity of pile foundation is limited by the recovery of soil,which is different from the conventional pile foundation.Relying on the test data of steel pipe piles constructed by the resonance-free method,according to other current similar pile foundation construction&acceptance standards,the study of the growth&recovery law of the bearing capacity of steel pipe piles can provide reference for the inspection&acceptance of similar engineering steel pipe piles.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200