检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李德龙[1,2] 黄萍 许小华[1] 单定军[3] 李亚琳 LI De-long;HUANG Ping;XU Xiao-hua;SHAN Ding-jun;LI Ya-lin(Jiangxi Provincial Institute of Water Science,Nanchang 330029,China;State Key Lab of Hydrology-Water Resources and Hydraulic Engineering,Hohai University,Nanjing 210098,China;Zhelin Hydropower Station of State Grid Jiangxi Electric Power Company Limited,Jiujiang 332000,China)
机构地区:[1]江西省水利科学研究院,江西南昌330029 [2]河海大学水文水资源与水利工程科学国家重点实验室,江苏南京210098 [3]国网江西省电力有限公司柘林水电厂,江西九江332000
出 处:《水电能源科学》2020年第12期62-65,共4页Water Resources and Power
基 金:江西省水利厅课题(201820YBKT14);江西省重点研发计划项目(20161BBG70089)。
摘 要:第二溢洪道是柘林水库重要的泄水工程,其泄水能力占整个枢纽的70%,但下游行洪区内人口密集,且有大量建房,一旦启用泄洪,保障区内人民生命财产安全将是重点关注的问题。利用MIKE21 FM非结构化网格模型对下游行洪区进行洪水风险分析,验证对比表明,利用MIKE21 FM构建的二维水动力学模型计算得出的淹没范围较为合理,可为当地防汛部门制定转移措施提供依据,保障区内人民生命财产安全,具有较好的应用价值。The second spillway is a great important drainage project of the Zhelin Reservoir,and its drainage capacity accounts for 70% of the whole project.However,the downstream flood way district is densely populated and has a large number of houses built.When the second spillway is used,how to ensure the safety of people’s lives and property in the area will be a major concern.In this paper,the flood simulation analysis was carried out on the downstream flood way district by the MIKE21 FM unstructured grid model.After the empirical comparison,the results show that the simulation results of the two-dimensional hydrodynamic model constructed are reasonable.Especially,the calculated inundation area can be used to formulate transfer measures in advance for the local flood control departments,and guarantee effectively the safety of life and property.The research results has good application values.
关 键 词:MIKE21 FM 柘林水库 第二溢洪道 行洪区 洪水风险分析
分 类 号:TV122.3[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.9.5