检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程东东 CHENG Dongdong(Huipodi Coal Mine,Fenhe Coking Coal Co.,Ltd.of Shanxi,Hongtong 041600,Shanxi,China)
机构地区:[1]山西汾河焦煤股份有限公司回坡底煤矿,山西洪洞041600
出 处:《能源与节能》2020年第12期134-136,共3页Energy and Energy Conservation
摘 要:以回坡底煤矿11-1021巷底鼓现象为研究背景,通过弹性半平面无限理论分析得到9.88 MPa的巷道主应力差加剧了底鼓现象。基于此,对复杂应力叠加影响区含亲水岩层巷道底鼓控制进行了研究。底板充填加固方案的应用成功缓解了底鼓变形严重的问题,为安全生产提供了重要保障。With the floor heave phenomenon in 11-1021 roadway of Huipodi Coal Mine as the research background,the elastic semi-plane infinite theory analysis shows that the main stress difference of the roadway of 9.88 MPa aggravates the floor heave phenomenon.Based on this,the paper studied the floor heave control of roadway containing hydrophilic rock in complex stress superimposed influence zone.The application of floor heave reinforcement scheme successfully alleviated the serious floor heave deformation,providing an important guarantee for safe production.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7