检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康永强 KANG Yong-qiang(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin 300222,China)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《广西水利水电》2020年第6期90-92,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:驮英水库及灌区工程调压井开挖施工由于地质条件差,施工断面小,工作环境和施工条件差,施工难度较大,且存在较大的安全隐患。介绍了调压井开挖及支护方案,论述了施工方法和工程质量、安全生产控制措施及应急预案。Tuoying Reservoir Irrigation Zone Project is designed with surge tank.The excavation of surge tank is difficult and has great safety risks due to poor geological conditions,small construction section,poor working environment and construction conditions.An introduction was made on the excavation and support scheme,construction methods,measures for quality control and construction safety as well as the emergency plan.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222