检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:景登凯 JING Deng-kai(China Railway Guizhou Engineering Co.,Ltd.,Guiyang 550003,China)
出 处:《广西水利水电》2020年第6期93-95,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍了明渠土方填筑及压实的施工方法和工序,论述了土方压实的原理及影响压实度的主要因素。结合驮英水库灌区干渠施工实践,探讨了控制土方压实度的方法、要点和措施。An introduction was made on the construction method and sequence of open channel earthwork filling and compacting,based on which the author demonstrated the principle of earthwork compaction and main factors influencing compaction degree.Combined with the construction practice of main channel in Tuoying Reservoir irrigation zone,the author discussed the method,key points and measures for control of earthwork compaction degree.
分 类 号:TV523[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200