检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董哲仁[1] 张晶[1] 赵进勇[1] DONG Zhe-ren;ZHANG Jing;ZHAO Jin-yong(China Institute of Water Resources and Hydropower Research,Beijing 100038,P.R.China)
出 处:《水生态学杂志》2020年第6期1-8,共8页Journal of Hydroecology
基 金:水利部公益性行业科研专项(201501030);国家自然科学基金(51509271)。
摘 要:由于鱼类洄游是大尺度的水生动物迁徙运动,恢复鱼类洄游通道规划应在流域尺度进行。探讨了恢复鱼类洄游通道规划要点,包括河流鱼类调查及评价方法、规划范围和流域恢复洄游通道目标量化方法,提出了恢复鱼类洄游通道项目的优先排序方法,并以保护和恢复多瑙河鲟鱼规划作为典型案例进行了分析。优先排序方法中,应根据工程性质、特点和当地自然条件确定优先排序准则,从而选择重点河段和重点工程,解决洄游通道中的关键问题。优先排序准则包括有效性、栖息地适宜性、效益/投资分析、自然保护区范围、预期物种多样性、鱼类生产力和栖息地面积等。在保护和恢复多瑙河鲟鱼规划案例中,确定了多瑙河鱼类洄游障碍物的5个等级划分标准和评分等级,采用改进的多准则、多权重分级计分法,计算了各障碍物的排序指标。在671处障碍物中,29处为最优先排序,99处为中等排序,543处为低等级排序;其中,位于多瑙河中游和下游的铁门水电站Ⅰ、Ⅱ级是流域内的主要障碍物。Planning the restoration of fish migration should be carried out at the watershed scale because fish migration is large-scale movement.In this study,the key points of planning for fish migration restora-tion were addressed:fish survey and evaluation methods,the planning scope and quantitative methods for developing objectives to restore fish migration.A method for ranking restoration projects is presented and aprogram for protecting and rehabilitating the Danube sturgeon was analyzed as a case study.Prioritization criteria should be determined according to engineering characteristics and local natural conditions.River sections and projects should be selected to solve key migration route problems.Prioritization criteria in-clude effectiveness,habitat suitability,cost-benefit analysis(CBA),nature reserve range,species diversi-ty,fish productivity and habitat area.In ranking priorities,the first thing is to identify the main migratory passages,especially the river sections where important anadromous fish must pass.Given the status of some fish and economic efficiencies,not all migration barriers on the main stem of a river should be re-moved to restore a migration route.The prioritization index(PI)values of fish migration restoration pro-jects are calculated using graded score rankings.European and American countries have experience plan-ning the restoration of fish migration channels and this experience can be useful.In the case study for pro-tecting and rehabilitating the Danube sturgeon,five ranking criteria were used calculate scores for migra-tory barriers on the Danube River.An improved multi-criteria,multi-weighted scoring method was used to calculate the prioritization index of each obstacle.Among the 671obstacles,29were ranked high priority,99were ranked moderate priority,and 543were ranked low priority.The key obstacles in the basin were I-ron Gates I and II located midstream and downstream in the Danube.The priority ranking method provides guidance for restoring fish migration.Where and when to carry out
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.180.227