白市大坝廊道渗漏量资料分析与安全评价  被引量:3

The data analysis on the permeate capacity of Baishi hydroelectric dam corridor

在线阅读下载全文

作  者:张玉平 李清华 王得 刘效 ZHANG Yuping;LI Qinghua;WANG De;LIU Xiao(The Dam Monitoring Centre of Hunan Wuling Power Corporation,Changsha 410004,China;不详)

机构地区:[1]湖南五凌电力科技有限公司大坝监测中心,长沙410004 [2]不详

出  处:《水科学与工程技术》2020年第6期39-44,共6页Water Sciences and Engineering Technology

摘  要:白市电站大坝监测系统已经运行7年,通过监测资料分析廊道渗漏规律及成因,分析表明,大坝坝段间接缝开合度与库水温的变化密切相关,即气温降低而增大,气温升高而减小,廊道渗漏量大小与库水温呈正相关性。整个大坝廊道渗水量的周期变化是安全的,但要预防低温天气带来的负面影响。The monitoring system of Baishi hydroelectric dam has been in operation for 5 years.The permeate capacity of the corridor is measured by the automatic measurement system and the reliability and correctness of the data are checked.It is showed that the data correctly reflect the change of the corridor permeate capacity.The alteration of structural joints and the construction joints of the dam was closely related to the alteration of water temperature.The permeate capacity of the corridor and the water temperature of reservoir were in close relationship.

关 键 词:白市水电站 渗漏量 库水温 相关性 

分 类 号:TV641[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象