检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张志飞[1] Zhang Zhifei(Zijin Mining Group Co.,Ltd.)
出 处:《黄金》2020年第12期39-43,52,共6页Gold
摘 要:紫金山金铜矿深部铜矿开采在采矿安全、效率、成本等方面逐渐暴露出一系列问题。对大孔凿岩硐室布置形式、炮孔布置、矿房底部出矿结构进行优化,并进行现场工业试验,取得了较好的技术经济指标和经济效益。采准切割工程量减少约20%,充填量减少约500 m^3,大孔凿岩量减少约9%,单矿房累计可实现降本增效69.54万元,提高了企业的经济效益和社会效益,可供类似矿山开采参考借鉴。Mining in deep copper mines of Zijinshan Gold-Copper Mine is exposed to a series of problems such as mining safety,efficiency and cost.So the layout form of large-hole drilling chamber,borehole layout,ore room bottom structure for ore drawing are optimized,which in field industrial test conducted achieves good technical and economic profits:preparation and cutting volume is reduced by about 20%,the filling volume is reduced by about 500 m^3,large-hole drilling volume decreases by about 9%,and 695400 yuan at cost reduction and efficiency increase can be achieved in a single ore room accumulatively.The optimization improves economic and social benefits for an enterprises and can be used as a reference by similar mines.
关 键 词:阶段矿房 大直径深孔 凿岩硐室 双排巷 炮孔布置 底部结构
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.2.160