淮河流域某无深度处理污水厂的一级A达标改造  

The satandard lift and renovation of wastewater treatment plant without advanced treatment process in Huaihe River basin

在线阅读下载全文

作  者:王建西 Wang Jianxi(North China Municipal Enginering Design C Research Institute Co.Ltd.,Tianjin 300381,China)

机构地区:[1]中国市政工程华北设计研究总院有限公司,天津300381

出  处:《供水技术》2020年第5期55-58,共4页Water Technology

摘  要:某污水处理厂位于淮河中游,设计处理能力为10×104m3/d,最初设计出水水质执行《城镇污水处理厂污染物排放标准》(GB l8918—2002)一级B标准。2014年采用ARP/SSH工艺对污水处理厂进行一级A提标改造。提标完成后,在进水低碳氮比、无外加碳源、无深度处理的条件下,通过ARP/SSH工艺、氧化沟、二沉池共同发挥各自优势,出水BOD5、CODCr达到地表Ⅲ类水质标准,TP优于Ⅳ类标准,NH3-N优于Ⅴ类标准。出水水质大幅提升,实现了一级A全面达标,且吨水电耗略有降低。A wastewater treatment plant is located in the middle part of Huaihe River,with a design capacity of 10×104 m3/d,and the initial effluent quality was designed in accordance with the first-class B standard of the Discharge standard of pollutants for municipal wastewater treatment plant(GB 18918—2002).In 2014,the ARP/SSH process was applied to upgrade the wastewater treatment plant to first-class A standard.After the completion of standard upgrading,under the conditions of low C/N ratio,no additional carbon source and no advanced treatment,the ARP/SSH process,oxidation ditch and secondary sedimentation tank harnessed their respective advantages,with effluent BOD5 and CODCr reached classⅢof the surface water standard,TP was better than classⅣ,and NH3-N was better than classⅤ.The effluent quality had been greatly improved,fully apply with the first-class A standard with the power consumption per ton slightly reduced.

关 键 词:ARP/SSH工艺 氧化沟 二沉池 深度处理 回流污泥 曝气再生 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象