检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王君卿 Wang Junqing(Xiegou Mine,Shanxi Xishan Jinxing Energy Corporation Ltd.,Lvliang 033602,China)
机构地区:[1]山西西山晋兴能源有限责任公司斜沟煤矿,山西吕梁033602
出 处:《煤炭与化工》2020年第11期67-70,73,共5页Coal and Chemical Industry
摘 要:斜沟煤矿23107面回采阶段巷道频繁淋水且淋水量较大,须对该工作面进行突水危险性评价。通过打钻测压计算,该工作面突水系数为0.134 MPa/m,结合数值模拟回采结果,回采阶段内工作面前方和煤壁侧应力集中化程度高,工作面底板和后方采空区均发生了拉伸和剪切破坏,产生了导水裂隙,表明该工作面有突水危险性。采用底板注浆对工作面进行改造,共施工16个钻场,96个钻孔。注浆改造后实践表明,底板塑性区变形得到改善,检验钻孔最小涌水量为0.20 m^3/h,最大为5.83 m^3/h,均小于10 m^3/h的现场要求,说明注浆效果良好,保证了工作面顺利回采。23107 recovery mining face of Xiegou Mine is subject to frequent and large water showers,and the face must be evaluated for sudden water surge hazard.In combination with the results of numerical simulation of the recovery phase,the stress concentration degree in front of the working face and coal wall side was high,and the tensile and shear damages occurred in the face bottom plate and the rear mining space,resulting in water-conducting cracks,indicating that the face was at risk of sudden water penetration.The bottom plate grouting was used to modify the working face,and 16 drill sites and 96 holes were constructed.After the transformation,the practice showed that the deformation of the plastic zone of the bottom plate was improved,and the minimum gush of water in the inspection borehole was 0.20 m^3/h,and the maximum was 5.83 m^3/h,both were smaller than the on-site requirement of 10 m^3/h,which showed that the grouting effect was good and ensured the smooth recovery of the working face.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7