三交河矿防水闭墙设计与应用  

Design and application of waterproof closed wall in sanjiaohe mine

在线阅读下载全文

作  者:赵会杰 杨泽进 Zhao Huijie;Yang Zejin(Linfen Coal Engineering Project Evaluation Center,Linfen 041000,China;Taiyuan Design and Research Institute Group Co.,Ltd.,Taiyuan 030001,China)

机构地区:[1]临汾市煤炭工程项目评审中心,山西临汾041000 [2]煤炭工业太原设计研究院集团有限公司,山西太原030001

出  处:《煤炭与化工》2020年第11期71-73,共3页Coal and Chemical Industry

摘  要:为解决三交河矿一采区生产安全受相邻矿老空水的影响,研究决定在采区大巷中设置防水闭墙,设计运用规范、手册及力学相关公式,对防水闭墙的厚度、位置及强度进行计算。结合所选的混凝土强度和掏槽深度,以及闭墙所处巷道围岩力学参数,得出防水闭墙厚度为1.5 m,墙外侧壁距交岔口为3.5 m,强度满足要求。现场施工后防水闭墙稳定性良好,证实了设计方案的可行性,为该矿和其他矿井遇类似问题需设置防水闭墙提供了理论依据和技术支撑。In order to solve the problem that the production safety of No.1 mining area of Sanjiaohe Mine affected by goaf of the adjacent mine,it was decided to set up the waterproof wall in the main roadway of the mining area.The thickness,position and strength of the waterproof wall were calculated according to the design and application of the specifications,manual and relevant mechanical formulas.The selected concrete strength and cutting depth was combined with the mechanical parameters of the surrounding rock of the roadway.The results showed that the thickness of the waterproof closed wall was 1.5 m,the distance between the outer wall and the crossing was 3.5 m,and the strength met the requirements.After on-site construction,the stability of the waterproof wall was good,which proved the feasibility of the design scheme,and provided theoretical basis and technical support for the setting of waterproof wall in other similar mines.

关 键 词:防水闭墙 积水压力 墙体厚度 抗剪强度 

分 类 号:TD74[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象