Relationship between Cavity String Assembling in Cleanroom and the Onset of Field Emission  

洁净间腔串装配与场致发射的关系

在线阅读下载全文

作  者:Xiong Pingran Song Yukun Shi Zhixiong Guo Hao You Zhiming Jiang Tiancai Zhang Shengxue Yue Weiming Li Yongming Zhang Shenghu He Yuan 

机构地区:[1]不详

出  处:《IMP & HIRFL Annual Report》2017年第1期240-241,共2页中国科学院近代物理研究所和兰州重离子研究装置年报(英文版)

摘  要:The pilot ADS project hosted by IMP and IHEP,which aims to produce a CW proton beam with beam current 10 mA@25 MeV,has successfully ejected out a pulsed proton beam with beam current 12.6 mA@26.1 MeV.It has four cryomodules,totally 22 superconducting cavities.The first two cryomodules,each consists of six Half Wave Resonators(HWRs)with=0.1,have the same structure.The third cryomodule is made up of five tapered HWRs with=0.15.The first three cryomodules are supplied by IMP and the fourth one by IHEP,which consists of five elliptical cavities with=0.21.This paper will show some interesting results about cavity string assembling in cleanroom and the onset of field emission.

关 键 词:structure. beam totally 

分 类 号:O57[理学—粒子物理与原子核物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象