检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李磊[1] 杨进[1] 刘宝生 赵少伟 张灿 杨宇鹏 张昌超 邹欣 LI Lei;YANG Jin;LIU Baosheng;ZHAO Shaowei;ZHANG Can;YANG Yupeng;ZHANG Changchao;ZOU Xin(China University of Petroleum(Beijing),Beijing 102249,China;CNOOC China Limited Tianjin Company,Tianjin 300452,China)
机构地区:[1]中国石油大学(北京) [2]中海石油(中国)有限公司天津分公司
出 处:《石油钻采工艺》2020年第5期569-572,共4页Oil Drilling & Production Technology
摘 要:深井钻井需要考虑对不同压力层系和复杂地层封隔,井身结构是确保钻井作业优快钻达目的层的重要影响因素。以渤中区块深井为例分析了井身结构优化设计过程,通过渤中区域深层地质分析和随钻测井实时数据,基于多源数据融合技术对钻前压力预测模型不断实时更新,得到较为精确的钻前孔隙压力,再根据地质特点、井控、三压力剖面等因素对井身结构进行优化设计,通过减少技术套管的层数、优化套管下深,将原六开井身结构优化为五开,形成一套适合该区域的井身结构。该技术可以在保证钻井安全的前提下,有效地规避作业中可能出现的复杂事故,以达到缩短钻井周期和提高机械钻速的目的,也可以为后续海上深层钻井作业井身结构设计提供参考。In the drilling process of deep wells,it is necessary to isolate the formations with different pressure systems and the complex formations.And casing program is an important influential factor to ensure the drilling of target layer fast and optimally.In this paper,the optimized design process of casing program was analyzed by taking the deep well in the central Bohai Block as an example.The predrilling pressure prediction model was updated continuously in real time by means of multi-source data fusion technology,based on geological analysis and real-time data of logging while drilling of the deep layers in the central Bohai area,so that the obtained predrilling pore pressure is more accurate.Then,the casing program was optimally designed according to geological characteristics,well control and three-pressure profile,and the original six-section hole structure was optimized into the five-section by reducing the number of technical casing layers and optimizing the casing setting depth.Thus,a set of casing program suitable for this area was developed.This technology can effectively avoid the complex accidents that may occur in the process of operation under the premise of ensuring the drilling safety,so as to reach the target of shortening the drilling cycle and improving the rate of penetration(ROP).And it can also provide references for the casing program design of offshore deep drilling operation in the following step.
关 键 词:渤中区域 井身结构 套管层次 地层压力预测 优化设计
分 类 号:TE52[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229