检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张超 沈静 张群 ZHANG Chao;SHEN Jing;ZHANG Qun(Network Management Center of China Mobile Communications Group Liaoning Co.,Ltd.,Shenyang 110000,China)
机构地区:[1]中国移动通信集团辽宁有限公司网络管理中心,辽宁沈阳110000
出 处:《通信电源技术》2020年第S01期389-392,共4页Telecom Power Technology
摘 要:5G基站设备包括5G基站AAU设备、5G传输设备,以及前期部署的4G BBU设备、4G传输设备,空调及照明设备等。文中通过对5G基站设备用电量测算,通过对5G设备工作时耗电量分析,结合基站内动环监控主机、灯光控制器、红外传感器、空调节能控制器对基站内短时间不用且不影响业务的设备进行临时下电,从而达到5G基站节能的目的。5G base station equipment includes 5G base station AAU equipment,5G transmission equipment,4G BBU equipment,4G transmission equipment,air conditioning and lighting equipment,etc.In this paper,through the calculation of 5G base station equipment power consumption,through the analysis of 5G equipment working power consumption,combined with the dynamic environment monitoring host,light controller,infrared sensor,air conditioning energysaving controller in the base station,the equipment that is not used for a short time in the base station and does not affect the business are temporarily powered off,so as to achieve the purpose of 5G base station energy saving.
关 键 词:5G基站电量测算 灯光控制器 空调节能控制器 节能措施
分 类 号:TN9[电子电信—信息与通信工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.64.3