检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李冬爱 张琨[1] 魏文君[1] 付春婵 LI Dong-ai;ZHANG Kun;WEI Wen-jun;FU Chun-chan(Sinosteel Xi’an Machinery Co.,Ltd.,Xi’an 710210,China)
机构地区:[1]中钢集团西安重机有限公司,陕西西安710210
出 处:《重型机械》2020年第6期86-89,共4页Heavy Machinery
摘 要:将冷剪的剪切能力由850 t升级到1300 t,冷剪曲轴与齿轮之间的锥面所形成的无键连接是整个设备装配的难点及重点,安装的好坏决定着冷剪的设备质量,原有的加热安装法目前已不能满足要求。本文在对比分析加热安装缺陷的基础上,提出冷装油压法进行安装,设计制作了一套冷剪的专用工装,实践表明冷装油压法明显提高了装配质量以及装配速度,取得了明显的经济效益。The key points and difficulties,of cold shear capacity upgrading from 850 tons to 1300 tons,is the key-less connection formed by the taper surface between the crankshaft and the gear of the cold shear.It determines the quality of cold shear,while the original heating installation method is no longer applicable.This paper compared to defects of heating installation,raised a new cold installation oil pressure method,designed a set of special tooling for cold shear.The practice shows that cold installation obviously improved the assembly quality and speed.It achieved obvious economic benefits.
分 类 号:TG333.21[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222