检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Huali HAN Yalin LIU Can WANG
出 处:《Frontiers of Engineering Management》2020年第4期618-621,共4页工程管理前沿(英文版)
摘 要:1 Background The offshore wind resources of China are widely distributed and have large regional differences.The Yellow Sea and Bohai Sea areas,which account for 60%of the developable sea area,have an annual average wind speed of less than 7.5 m/s(Xu et al.,2013).According to the current level of offshore wind power transportation,construction,and operation and maintenance,the profit balance point of 5.0 MW offshore wind turbines is 3000 h/year(Zheng,2017).However,in the Yellow Sea and Bohai Sea areas,even if the world’s best offshore wind turbines at that time are used,their full power generation hours can only reach approximately 2900 h/year.This phenomenon is on the verge of profitability or loss,resulting in a large number of sea areas,especially the Bohai Sea area,with no development value.Therefore,developing offshore wind turbines with strong power generation capacity and low cost,which is suitable for the sea areas in China,is urgently needed.Thus,the H1715.0 MW offshore wind turbine project is introduced.
关 键 词:renewable energy megawatt offshore wind turbine technology-driven quality improvement
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15