作 者:逄立辉[1,2] 于生波 房恩泽[1,2] 尚玉超 PANG Lihui;YU Shengbo;FANG Enze;SHANG Yuchao(China Water Northeastern Investigation,Design&Research Co,Ltd.,Changchun 130021,China;Research Center of Engineering Technology in Cold Regions,Ministry of Water Resources,Changchun 130021,China)
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林省长春市130021 [2]水利部寒区工程技术研究中心,吉林省长春市130021
出 处:《水电与抽水蓄能》2020年第6期83-85,共3页Hydropower and Pumped Storage
摘 要:通过对抽水蓄能电站地下厂房洞室系统排水设计的探析,浅谈地下洞室排水设计的技术特点及发展方向,洞室系统排水既要考虑围岩渗漏水,又要考虑机组设备渗漏水。排水方案要确保厂房防淹的同时,又要确保油水分离的环保要求。为后续工程地下洞室系统排水设计提供借鉴和指导。Based on the analysis of drainage design of underground cavern of pumped storage power station,this article discusses the technical characteristics and development direction of drainage design of underground cavern,cavern drainage system should consider not only surrounding rock leakage,but also unit equipment leakage.Drainage plan should ensure not only flood prevention of powerhouse,but also environmental protection requirement of oil-water separation.The article provides reference and guidance for drainage design of future hydropower station underground powerhouse.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15