检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙斌 Sun Bin
机构地区:[1]中国铁路设计集团有限公司线路站场枢纽设计研究院,天津300308
出 处:《建筑技术开发》2020年第15期91-92,共2页Building Technology Development
摘 要:山区线路选线时,需要综合考虑工程投资、规划结合、环境影响、地形地质条件等因素。一个合理的线路方案可用最小的经济投资换取最大的工程效益。以集通铁路扩能改造工程中蒙根塔拉至林西越岭段落线路方案为例,重点探讨了限制坡度、线路走向的选择及越岭隧道对线路方案的影响,结合实例分析提出了部分可供后续项目借鉴的思路。When selecting route of railways in mountainous area,it is necessary to consider comprehensively such factors as project investment,combination of planning,environmental impact,topographic and geological conditions,etc. A reasonable route scheme can exchange the smallest economic investment for the greatest engineering benefit. In this paper,taking the line scheme of Linxi Mountain Crossing Section in Jitong Railway Expansion and Renovation Project as an example,the selection of limit gradient and route direction,as well as the influence of over-mountain tunnel on the line scheme are emphatically discussed. Based on the case analysis,some ideas which can be used for reference by subsequent projects are put forward.
分 类 号:TU75[建筑科学—建筑技术科学] U212.32[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170