检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苗磊 MIAO Lei(Linyi Water Conservancy Engineering Office,Linyi 276000,Shandong,China)
出 处:《水利科技与经济》2020年第11期70-73,共4页Water Conservancy Science and Technology and Economy
摘 要:以山东临沂市某水库引水渠工程为例,通过比选确定明渠输水渠线布置方案,并分析地质条件得出存在冻胀土问题,对此设计铺设厚40 cm戈壁垫层。通过比选确定现浇砼板梯形横断面,结合渠道需求,对渠道纵断面参数进行设计计算。Taking the diversion canal project of a reservoir in Linyi city of Shandong Province as an example,the paper determines the layout plan of the open channel water diversion canal line through comparison and selection,and analyzes the geological conditions to find out the problem of frost heaving soil,for which a 40 cm thick Gobi cushion is designed and laid.The trapezoid cross section of the cast-in-place concrete slab is determined by comparison and selection,and the parameters of the vertical section of the channel are calculated and designed according to the needs of the channel.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33