检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭浩洋[1] 雷丽萍 GUO Haoyang;LEI Liping(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《西北水电》2020年第S02期108-111,共4页Northwest Hydropower
摘 要:以某水电工程导流洞永久封堵体为工程实例,结合工程区气候条件,采用大型通用有限元软件ANSYS,对封堵体混凝土施工期的温度场及温度应力场进行了仿真分析,分析了不同方案温控措施变化对封堵体混凝土温度场及应力场的影响,提出了有效的堵头混凝土施工温控措施,可为类似工程温控措施的优选提供参考。Taking a permanent plugging body of a diversion tunnel of a hydropower project as an engineering example,combining with the climatic conditions of the project area,using the large-scale universal finite element analysis software ANSYS,the temperature field and temperature stress field of the plugging body concrete during the construction period are simulated and analyzed.The influence of temperature control measures in different schemes on the temperature field and stress field of the plugging concrete is analyzed,and effective temperature control measures for the construction of the plug concrete are proposed,which provides a reference for the optimization of temperature control measures for similar projects.
分 类 号:TV551.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.169.218