检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔邯龙[1] 常子政 孟文清[1] 姜新佩[1] 张铭琦 CUI Hanlong;CHANG Zizheng;MENG Wenqing;JIANG Xinpei;ZHANG Mingqi(College of Civil Engineering,Hebei University of Engineering,Handan 056038,China;Institute of Architectural Design,Tsinghua University,Beijing 100084,China)
机构地区:[1]河北工程大学土木工程学院,河北邯郸056038 [2]清华大学建筑设计研究院,北京100084
出 处:《粉煤灰综合利用》2020年第6期1-6,共6页Fly Ash Comprehensive Utilization
基 金:国家重点研发计划(2018YFF0300201)。
摘 要:随着数字化中国深入发展,建筑信息模型(BIM)技术在传统建筑行业广泛应用,然而在山区赛道工程中仍处于起步阶段。针对山区赛道工程的异形空间曲面结构、钢结构复杂节点以及钢筋排布密集构造复杂等设计难点,本文以张家口奥林匹克体育公园国家跳台滑雪中心项目为例进行研究。通过将Revit软件和Dynamo可视化编程插件相结合,建立赛道精细化模型,得到可视化载体,让结构复杂的曲面建筑再度空间化,做到所见即所得。同时,应用BIM技术对复杂钢结构节点以及排布密集的钢筋节点进行深化设计,输出钢结构设计图纸,优化节点钢筋排布。应用BIM技术进行数字化协同设计,提高结构设计效率和图纸质量,减少因图纸变更对工程造成的影响,同时为赛道工程数字化协同设计提供一定的技术思路和指导。With the in-depth development of digital China,building information modeling(BIM)technology has been widely applied in the traditional construction industry.However,it is still in its infancy in mountain track engineering.Aiming at the design difficulties of racetrack engineering in mountainous areas,such as irregular space curved structure,complex steel structure joints and complex reinforcement arrangement and dense structure,this paper takes Zhangjiakou Olympic Sports Park National Ski Jumping Center project as an example to study.By combining Revit software and Dynamo visual programming plug-in,the track refinement model is established to obtain the visual carrier,so that the complex curved building is spatialized again and what you see is what you get.At the same time,BIM technology is applied to deepen the design of complex steel structure joints and reinforcement joints with dense arrangement,output the design drawings of steel structure,and optimize the reinforcement arrangement of joints.BIM technology is applied for digital collaborative design to improve the efficiency of structural design and drawing quality,reduce the impact of drawing changes on the project,and provide certain technical ideas and guidance for digital collaborative design of track engineering.
分 类 号:TU245.4[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229