检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄堃 刘澄[1,2] 吕潇 马刚 HUANG Kun;LIU Cheng;LÜ Xiao;MA Gang(Nari Group Corporation(State Grid Electric Power Research Institute),Nanjing 211106,Jiangsu,China;Nari Technology Co.,Ltd.,Nanjing 211106,Jiangsu,China;Nanjing Normal University,Nanjing 210046,Jiangsu,China)
机构地区:[1]南瑞集团(国网电力科学研究院)有限公司,江苏南京211106 [2]国电南瑞科技股份有限公司,江苏南京211106 [3]南京师范大学,江苏南京210046
出 处:《电网与清洁能源》2020年第11期127-133,共7页Power System and Clean Energy
基 金:国家电网有限公司科学技术项目(SGMD0000YXJS1900502)。
摘 要:光伏逆变器的剩余容量利用在解决分布式光伏发电系统并网点电压越限问题时取得了较好的效果,但目前为了提升逆变器的无功容量,相关研究主要集中在限制逆变器有功输出,未考虑对分布式光伏发电系统渗透率的影响。阐明分布式光伏发电系统并网点电压越限机理,提出一种计及本地负荷的分布式光伏并网点电压协同控制策略。通过背靠背变流器控制光伏发电本地负荷无功,通过控制并网逆变器工作状态改变光伏发电输出功率。设置制动控制环节,出现越限现象时优先采取本地负荷无功控制调节并网点电压,避免对配电网消纳光伏发电能力的影响。最后基于Matlab/Simulink仿真平台进行试验验证了所提控制策略的可行性与有效性。The utilization of the remaining capacity of the photovoltaic inverter has achieved good results in solving the problem of voltage over-limit of the grid-connected point of the distributed photovoltaic power generation system. However,to increase the reactive power capacity of the inverter,the relevant research mainly focuses on limiting the active output of the inverter,without considering the impact on the penetration rate of the system.This paper expounds the mechanism of the voltage over-limit violation of the grid-connected point of the distributed photovoltaic power generation system and proposes a distributed photovoltaic grid-connected point voltage coordination control strategy considering the local load. Back-to-back converters are used to control the reactive power of the local load of photovoltaic power generation. The output power of photovoltaic power generation is controlled by changing the working status of the grid-connected inverter. The brake control link is set. When the voltage over-limit occurs,the local load reactive power control is preferentially adopted to adjust the voltage of the grid connection point to avoid the impact on the distribution network’s ability to absorb photovoltaic power generation. Finally, the feasibility and effectiveness of the control strategy proposed in this paper are verified by experiments based on the Matlab/Simulink simulation platform.
关 键 词:并网点电压 并网逆变器 本地负荷 电压越限 制动控制
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198