作 者:单体伟 周扬 王强 SHAN Tiwei;ZHOU Yang;WANG Qiang(Jiangsu Hydraulic Engineering Construction Co.,Ltd.,Yangzhou 225000,China;Changzhou Water Conservancy Construction Investment and Development Co.,Ltd.,Changzhou 213001,China)
机构地区:[1]江苏省水利建设工程有限公司,江苏扬州225000 [2]常州市水利投资公司,江苏常州213001
出 处:《江苏水利》2020年第S02期41-44,共4页Jiangsu Water Resources
摘 要:新沟河延伸拓浚工程常州市天宁区境内河道工程河道V标工程采用钢板桩和囊式扩大头锚索组合结构设计护岸,该工程位于常州市天宁区新沟河西岸,紧靠焦粮公路,公路沿线工厂和农村居民房屋众多,施工期间要求新沟河不断航、公路不断交通。做传统的护岸挡墙,河堤紧靠公路边、居民住地,原河岸线路长、场地狭小,土方不能大面积开挖,所以选用U型钢板桩做永久护岸,钢板桩顶部浇筑钢筋混凝土挡土墙加拉锚结构。钢板桩施工不能振动,为了避免周边建筑物振动影响,采用静压打桩机,减少干扰,缩短工期、施工质量得到保证。The river course V standard project of Xingou River extension dredging project in Tianning District,Changzhou City,adopted a combination structure bank protection type of steel sheet pile and anchor cable with capsule extension head.The project is located in the west bank of Xingou River,Tianning District,Changzhou City,close to Jiaoliang Road,along which there were many factories and rural residential houses.During the construction period,Xingou River was required to be continuously navigable and highways to be continuously trafficked.As a traditional revetment retaining wall,the embankment was close to the highway and the residential area,the original riverbank line was long and the site was narrow,the earthwork couldn't be excavated in a large area,therefore,the U-shaped steel sheet pile was chosen as the permanent revetment,and the steel sheet pile top was cast into the reinforced concrete retaining wall with anchor structure.Steel sheet pile construction could not be vibrated,in order to avoid the vibration of surrounding buildings,static pressure pile driver was adopted to reduce interference,shorten the construction period,and ensure the construction quality.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.18.105.157