检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙虎强 SUN Huqiang(Dadu River Production Command Center,CHN Energy,Chengdu,Sichuan,610041)
机构地区:[1]国家能源大渡河流域生产指挥中心,四川成都610041
出 处:《四川水力发电》2020年第6期108-111,共4页Sichuan Hydropower
摘 要:瀑布沟水电站是国家“十五”重点工程和西部大开发标志性工程,总装机容量为3600 MW,主要向成都、川西北和川南地区供电。瀑布沟机组全部投产接近9年,持续可靠的向电网供电1200多亿千瓦时,自适应重合闸在瀑布沟500 kV输出线路中的成功应用,可为其他新建同类型电厂提供参考和经验。Pubugou Hydropower Station is a national"Tenth Five Year Plan"key project and a landmark project of western development,with a total installed capacity of 3600MW.It mainly supplies power to Chengdu,Northwest Sichuan and South Sichuan.All Pubugou generator units have been put into operation for nearly nine years and have been constantly supplying more than 120 billion kwh to the power grid.The successful application of adaptive reclosing in Pubugou 500KV output line can provide reference and experience for other similar new built power plants.
分 类 号:TM762.2[电气工程—电力系统及自动化] TM622
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171