检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:普凯[1] PU Kai(Kunming Power Supply Bureau,Kunming 650000,China)
机构地区:[1]昆明供电局,云南昆明650000
出 处:《电工技术》2020年第24期135-136,共2页Electric Engineering
摘 要:近几年以来,随着我国经济及工业的不断发展,各个行业以及领域对电力的需求逐渐增大。现阶段110 kV高压电缆已经逐渐成为我国相关电力系统输送电能的重要工具,同时其也在一定程度上直接反映出来了我国电力系统是否正常运转。文章从110 kV高压电缆施工技术难点出发,探讨了针对相关施工难点的有效解决措施,从而提出在实际施工过程中各类问题的解决办法。In recent years,with the continuous development of China's economy and industry,the demand for electricity has gradually increased in various industries and fields.At this stage,110 kV high-voltage cables have gradually become an important tool for power transmission in my country's related power systems.At the same time,they also directly reflect to a certain extent whether my country's power systems are operating normally.Starting from the technical difficulties of 110kV high-voltage cable construction,the effective solutions for related construction difficulties were further discussed.Therefore,solutions to various problems in the actual construction of 110 kV high-voltage cables were proposed to promote the healthy and sustainable development of the relevant power industry in my country.
分 类 号:TM757[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222