110 kV高压电缆施工技术难点与解决措施分析  被引量:3

Analysis of Technical Difficulties and Solutions for 110 kV High Voltage Cable Construction

在线阅读下载全文

作  者:普凯[1] PU Kai(Kunming Power Supply Bureau,Kunming 650000,China)

机构地区:[1]昆明供电局,云南昆明650000

出  处:《电工技术》2020年第24期135-136,共2页Electric Engineering

摘  要:近几年以来,随着我国经济及工业的不断发展,各个行业以及领域对电力的需求逐渐增大。现阶段110 kV高压电缆已经逐渐成为我国相关电力系统输送电能的重要工具,同时其也在一定程度上直接反映出来了我国电力系统是否正常运转。文章从110 kV高压电缆施工技术难点出发,探讨了针对相关施工难点的有效解决措施,从而提出在实际施工过程中各类问题的解决办法。In recent years,with the continuous development of China's economy and industry,the demand for electricity has gradually increased in various industries and fields.At this stage,110 kV high-voltage cables have gradually become an important tool for power transmission in my country's related power systems.At the same time,they also directly reflect to a certain extent whether my country's power systems are operating normally.Starting from the technical difficulties of 110kV high-voltage cable construction,the effective solutions for related construction difficulties were further discussed.Therefore,solutions to various problems in the actual construction of 110 kV high-voltage cables were proposed to promote the healthy and sustainable development of the relevant power industry in my country.

关 键 词:高压电缆 技术难点 施工技术 解决措施 

分 类 号:TM757[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象